Software project timeline estimator: weeks per phase from scope and team size

A software project timeline is the sum of its phases: discovery, design, development, testing and launch. Development time grows with the number of unique screens and integrations and their complexity, and shrinks — less than proportionally — as developers are added, because coordination takes time. Design can overlap with development. Enter your scope below to see a phase-by-phase plan in weeks.

Free, no sign-up · By Infikey Technologies · Updated

Use the calculator

Your numbers

Reset
Complexity

Count distinct layouts, not every page that reuses one.

Payments, CRM, maps, ERP, SMS, etc.

Are designs ready?

Result

Estimated timeline

12.8 weeks

With 3 developers, this project takes about 12.8 weeks (2.9 months) from discovery to launch.

About 2.9 months end to end — typical for a first release. Weekly demos keep scope and timeline in check.

Timeline by team size
  • 1 developer 30.9 weeks
  • 2 developers 17.6 weeks
  • 3 developers 12.8 weeks
  • 5 developers 8.9 weeks
  • 6 developers 7.9 weeks
Software project timeline estimator results
Discovery & planning 1.1 weeks
UI/UX design 2.6 weeks (half overlaps development)
Development 7.5 weeks
Testing & stabilisation 1.9 weeks
Launch (incl. app store review) 1 week
Total development effort 19 developer-weeks
  • Doubling the team does not halve the timeline: every extra person adds coordination and review time.
  • Rule-of-thumb planning figures only. A real plan comes from breaking the scope into tasks.

Estimates for planning only, not professional advice. Infikey Technologies accepts no liability for decisions based on these results — read the disclaimer.

Want an expert to sanity-check these numbers?

Send these results to an Infikey specialist and get a reply for your situation.

Ask an expert

How this calculator works

MetricFormula
Development effort(2 + screens × weeks per screen + integrations × weeks per integration) × project-type factor
Weeks per screen / integrationsimple 0.3 / 1 · standard 0.5 / 1.5 · complex 0.8 / 2.5
Development weekseffort ÷ developers^0.85
Other phasesdiscovery 15%, design 35% (half in parallel), testing 25% of development, with minimums and caps

Worked example

With these inputs:

  • Project type: Web app / SaaS
  • Complexity: Standard (business logic, dashboards)
  • Unique screens or page layouts: 25
  • Third-party integrations: 3
  • Developers on the project: 3
  • Are designs ready?: No, design is needed

Estimated timeline: 12.8 weeks. With 3 developers, this project takes about 12.8 weeks (2.9 months) from discovery to launch.

Discovery & planning1.1 weeks
UI/UX design2.6 weeks (half overlaps development)
Development7.5 weeks
Testing & stabilisation1.9 weeks
Launch (incl. app store review)1 week
Total development effort19 developer-weeks

Open this example in the calculator

The five phases of a software project

PhaseWhat happensOutput
Discovery Workshops, user journeys, technical decisions, risks Scope, backlog and plan
Design Wireframes, visual design, prototype testing Approved screens and design system
Development Sprints of building, code review, weekly demos Working software
Testing Functional, device, performance and security testing; fixes Release candidate
Launch Deployment, app store review, monitoring, hand-over Live product

Why more developers is not always faster

Some work cannot be split, and every new person needs onboarding, reviews and meetings. This is why the estimator divides effort by team size raised to the power 0.85 rather than by team size itself.

Adding people late in a project often slows it down. It is more effective to start with the right team size and reduce scope if the date is fixed.

How to shorten a timeline

  • Cut the first release to the workflows that prove the idea.
  • Use proven components for login, payments and admin instead of building them.
  • Have decision-makers available for quick approvals.
  • Prepare content and integration credentials before development starts.
  • Run design and development in parallel once the core flows are approved.

Every option can be set in the web address, so you can bookmark a scenario or send it to a colleague. AI assistants such as ChatGPT, Gemini, Claude and Perplexity can use the same parameters to open this calculator with your numbers and the result already on the page.

ParameterWhat it setsAccepted values
project_type Project type one of website, web_app, mobile, mobile_native, enterprise
complexity Complexity one of simple, standard, complex
screens Unique screens or page layouts number from 1 to 500, default 25
integrations Third-party integrations number from 0 to 50, default 3
developers Developers on the project number from 1 to 30, default 3
design_ready Are designs ready? one of no, yes

Example: https://infikeytechnologies.com/tools/project-timeline-estimator?project_type=website&complexity=simple&screens=8&integrations=2&developers=1&design_ready=no

Also available as plain text for AI assistants and a free JSON API (OpenAPI spec).

Last reviewed by the Infikey Technologies team.

Disclaimer

This calculator is provided free for general information and planning only. Results are estimates based on the inputs you enter and the assumptions described on this page, reference data such as published prices may change, and actual costs and outcomes will differ. Nothing on this page is financial, legal, tax, investment or other professional advice. Infikey Technologies Private Limited, Infikey Technologies LLC and their directors, employees and affiliates make no warranty, express or implied, about the accuracy, completeness or suitability of this tool or its results, and accept no liability for any loss or damage, direct or indirect, arising from its use or from reliance on its results. Verify all figures independently and seek professional advice before making any decision. Use of this tool is at your own risk.

FAQ

Software project timeline estimator questions

How long does it take to build an app? +

A focused cross-platform app with around 25 screens and a few integrations typically takes a few months with a small team. Enter your own screens, integrations and team size above to estimate it.

How long does a website take to build? +

Small business websites often take a few weeks; larger sites with many layouts and integrations take longer. Choose "Website" as the project type to estimate yours.

How do you estimate a software project timeline? +

Estimate development effort from scope (screens, integrations, complexity), divide by an effective team size, then add discovery, design, testing and launch phases.

Does adding developers make the project faster? +

Up to a point. Each developer adds coordination overhead, so two developers are faster than one but not twice as fast.

Why is testing a separate phase? +

Testing happens during every sprint, but the end of a project needs time for full regression testing, device testing and fixing issues found by real users in beta.

Talk to an expert

Want an expert to sanity-check these numbers?

Your inputs and results are attached automatically, so we can reply with specific advice on Software engineering.